Re: [802SEC] Status of LMSC P&P
I also agree though I don't look forward to the process of getting
there.
Pat
-----Original Message-----
From: ***** IEEE 802 Executive Committee List *****
[mailto:STDS-802-SEC@LISTSERV.IEEE.ORG] On Behalf Of Sherman, Matthew J.
(US SSA)
Sent: Wednesday, September 26, 2007 11:45 AM
To: STDS-802-SEC@LISTSERV.IEEE.ORG
Subject: Re: [802SEC] Status of LMSC P&P
Agreed!
Matthew Sherman, Ph.D.
Engineering Fellow
BAE Systems - Network Systems (NS)
Office: +1 973.633.6344
Cell: +1 973.229.9520
email: matthew.sherman@baesystems.com
-----Original Message-----
From: J Lemon [mailto:jlemon@ieee.org]
Sent: Wednesday, September 26, 2007 2:37 PM
To: Sherman, Matthew J. (US SSA)
Cc: STDS-802-SEC@LISTSERV.IEEE.ORG
Subject: Re: [802SEC] Status of LMSC P&P
I think this would be to our benefit, allowing us to more easily and
more frequently modify the parts that are more likely to need
modification over time.
On 9/26/2007 5:26 AM, Sherman, Matthew J. (US SSA) wrote:
> Fellow LMSC Members,
>
>
>
> I am happy to report that AudCom accepted our updated P&P last night.
> However, there was a catch. They accepted it until the Dec 2008
> AudCom meeting, and they plan to direct us to 'generate a P&P based on
> the approved baseline P&P with as little extraneous material as
> possible'.
>
>
>
> Basically what they are saying is that we have a lot of material above
> and beyond what they require which makes it very difficult for them to
> review. They would like to see that material removed from the
> 'official' LMSC P&P, and perhaps captured else where. If captured
> elsewhere, they would not intend to review it. They would expect it
to
> be a subordinate document that LMSC would maintain internally.
>
>
>
> I am expecting LMSC will receive a formal input containing AudCom's
> direction. I plan to resurrect the 'Ops Manual' that has been kicking
> around for some time. My intent would be to restructure our existing
> P&P to more closely follow what is in the current AudCom 'baseline'
P&P.
> Part of that involves clearly defining the LMSC EC as the sponsor, and
> rearranging material from where it currently resides as a subsection
on
> the EC to the places AudCom would expect to see it in the baseline
P&P.
> I will remove all material not required by the baseline P&P to an
> 'Operations Manual' including all details about how Working Groups
> should operate, our special procedures on PAR's and preapprovals, etc.
> The Operations Manual would be an LMSC EC controlled rules document
that
> is subordinate to the LMSC P&P.
>
>
>
> I hope to have a draft of the revised P&P and Ops Manual prepared for
> the November meeting and discuss the concept at the Sunday Night P&P
> review. I am also open to comments on the reflector.
>
>
>
> Best Regards,
>
>
>
> Mat
>
>
>
> Matthew Sherman, Ph.D.
> Engineering Fellow
> BAE Systems - Network Systems (NS)
> Office: +1 973.633.6344
> Cell: +1 973.229.9520
> email: matthew.sherman@baesystems.com
>
>
>
>
>
>
> ----------
> This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.
>
>
----------
This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.