Re: [802SEC] +++ EC P&P Revision Ballot +++ compliance with SA Model P&P - Closes June 15
Matthew,
Sorry, I also have not had time to review the document and hence
will have to abstain. I will review it before the Portland session.
Regards,
Steve
_____________________________
Steve Shellhammer
Intel Corporation
(858) 391-4570
stephen.j.shellhammer@intel.com
-----Original Message-----
From: owner-stds-802-sec@listserv.ieee.org
[mailto:owner-stds-802-sec@listserv.ieee.org] On Behalf Of Sherman,
Matthew J. (US SSA)
Sent: Sunday, June 06, 2004 6:50 PM
To: STDS-802-SEC@listserv.ieee.org
Subject: Re: [802SEC] +++ EC P&P Revision Ballot +++ compliance with SA
Model P&P - Closes June 15
Hi Everyone,
As of this time, I have seen no comments, and received no votes on this
ballot. It closes in about 10 days. Please do let me know if you have
any comments, and vote on the ballot.
Thanks,
Mat
Matthew Sherman, PhD
Senior Member Technical Staff
BAE SYSTEMS, CNIR
Office: +1 973.633.6344
email: matthew.sherman@baesystems.com
-----Original Message-----
From: owner-stds-802-sec@LISTSERV.IEEE.ORG
[mailto:owner-stds-802-sec@LISTSERV.IEEE.ORG]On Behalf Of Sherman,
Matthew J. (US SSA)
Sent: Saturday, May 15, 2004 8:41 AM
To: STDS-802-SEC@LISTSERV.IEEE.ORG
Subject: Re: [802SEC] +++ EC P&P Revision Ballot +++ compliance with SA
Model P&P
Everyone,
This is just a resend of my last e-mail in case the attachment of the
zip file caused the e-mail not to be delivered. If you get this e-mail,
but did not get the last one, please contact me.
Thanks,
Mat
Matthew Sherman, PhD
Senior Member Technical Staff
BAE SYSTEMS, CNIR
Office: +1 973.633.6344
email: matthew.sherman@baesystems.com
> -----Original Message-----
> From: Sherman, Matthew J. (US SSA)
> Sent: Saturday, May 15, 2004 8:37 AM
> To: STDS-802-SEC@listserv.ieee.org
> Cc: Paul Nikolich; Jim Moore.; m.nielsen@ieee.org
> Subject: +++ EC P&P Revision Ballot +++ compliance with SA Model
P&P
>
> Dear EC members,
> This email initiates a EC P&P Revision Ballot. The ballot opens today
- May 15, 2004 and closes June 15, 2004 at 11:59 PM Eastern Daylight
Time. (Remember if you do not vote or abstain on this ballot it is
equivalent to a DISAPPROVE vote). Buzz, please ensure this gets sent to
the "802ALL" email list as well. WG chairs, if you haven't already done
so, please invite your WG members to comment through you.
> Attached you will find a zip file containing:
> 1) A P&P Revision cover letter
>
(802.0-Compliance_with_SA_Model_P&P-Balloted_P&P_Revision_ballot.pdf)
> 2) Text for the P&P revision
> (SA_Model_compliant_LMSC_P&P_040514.doc)
> 3) A mapping of text from the "old" P&P to the "new" P&P
> (LMSC_P&P-March_2004_R0_reformat-map_040514.doc)
> The scope of this P&P revision is to bring the LMSC P&P into
"editorial" conformance with the SA Model Sponsor P&P. That is to match
the format of the SA model Sponsor P&P, but not to add or deleted any
"governance" content from the current LMSC P&P. (I use the term
"Governance" here is sense analogous to the term "normative" in
standardese.) This letter ballot was approved at the Friday, March 19,
2004 EC meeting. The rationale for the changes being balloted are as
given in the attached cover letter.
> The actual changes are given in the second document listed above. The
changes are made in Word track changes mode against the SA model Sponsor
P&P (http://standards.ieee.org/board/aud/sponsmod.rtf). Normally, I
would provide a pdf of the changes rather than a word document, but I
have placed embedded comments in the file, and don't know how to
maintain them in pdf format. While this is a set of "editorial changes"
to bring our P&P into the same overall format as the SA model P&P, the
changes are very extensive, and a number of issues for future P&P are
noted. Please review the changes closely. I expect I will have
additional recommendations for editorial changes prior to the close of
this ballot. Note that all embedded comments will be removed from the
document once approved, prior to formal release. The comments are there
to highlight issues that have arisen during the reformatting process
that will have to be addressed in a future ballot as I believe them to
requir!
e governance changes.
> Note that a reformat map is provided in the third document listed
above. It is a heavily commented version of the current P&P that
indicates where in the "New P&P" each section of text from the "old P&P"
gets mapped. It will help the reader to confirm that I have neither
added nor deleted anything other than editorial content in reformatting
the P&P.
> Regards,
> Mat
> PS - Note that because of corporate firewall issues, I have renamed
the zip file extension to "renamed_zip". Prior to attempting to open
the zip file you should change the file extension back to "zip". If
anyone has problems opening the file please contact me and I will
provide the contents in uncompressed form.
>
> << File:
Compliance_with_SA_Model_P&P-Balloted_P&P_Revision_ballot.renamed_zip >>
>
>
> Matthew Sherman, PhD
> Senior Member Technical Staff
> BAE SYSTEMS, CNIR
> Office: +1 973.633.6344
> email: matthew.sherman@baesystems.com>
>
>
----------
This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector.
This list is maintained by Listserv.
----------
This email is sent from the 802 Executive Committee email reflector. This list is maintained by Listserv.