Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Bill,
I vote
do not approve with the following comments:
section 5.1.x: meeting notice should be 30 days.
section 5.1.x: quotation marks seem to be in the wrong place (end the
additional text too soon).
section 5.1.y.1: the EC composition is too large. It should be
reduced to the WG/TAG chair, vice chair(s), treasurer, and secretary, as
well as the task group chairs only. It is not clear if "All vice chairs"
and "all secretaries" include those of the task groups, as well as those of the
WG/TAG.
section 5.1.y.1 item 4.: "authorizer" should be "authorized" and
"approved signers" should be "authorized signers".
section 5.1.y.1 item 7.: is an onerous and unnecessary task to the extent
that copies of all invoices are required to be supplied in the required
report. This is supposed to be a report, not a detailed
audit.
section 5.1.y.1 item 11.: this does not specify when the review of the
interim registration fee by the LMSC EC is required. By its wording, this
could be done after the fees are collected and disbursed, before, or years
later.
section 5.1.y.1 item 12.: It seems that fees can be collected in excess
of the amount required for the interim session by the hosting WG/TAG from
non-members of the hosting WG/TAG, must not be spent on expenses outside the
interim hosted, but are not required to be returned. Do they just sit in
the account and accumulated interest? Can funds from fess collected from
non-members be disbursed first, guaranteeing that they are always spent on the
expenses of the hosted interim meeting and that any left over funds are from
members of the hosting WG/TAG? I think this item is superfluous and should
be replaced with a statement that the fees for interim meetings should be set as
a best effort to meet the interim expenses without any surplus. Any funds
remaining after expenses are paid revert to the general treasury of the hosting
WG/TAG.
section 5.1.y.1 item 13.: This item is unnecessary. If the WG/TAG
is operating with treasury, complying with IEEE financial procedures, and
meeting IEEE audit requirements, there is no need for additional LMSC EC review
of WG/TAG expenditures/collections.
section 5.1.y.1 item 22.: remove "and the LMSC EC" from the end of the
item. reasoning is the same as item 13 above.
-Bob
-----Original Message----- As a reminder, the closing date for this ballot
is Friday October 10, 2003 at 11:59 PM Pacific Time.
From: Bill Quackenbush [mailto:billq@attglobal.net] Sent: Wednesday, October 08, 2003 9:38 AM To: IEEE 802 SEC; Karen A Rupp Subject: [Fwd: [802SEC] +++ EC P&P Revision Ballot +++ on WG fiancial operations] The balloting to date is as follows. Only two ballots have been returned. Nikolich - Approve w/o
comment Thanks, wlq -------- Original Message --------
Dear EC members, Attached you will find the text for an EC Policies and Procedures revision ballot on WG Financial Operations. This letter ballot was approved at the Friday, July 25, 2003 plenary session. The scope and purpose of the changes being balloted are as given in the attached ballot document. The ballot opens September 10, 2003 and closes October 10, 2003 at 11:59 PM Pacific Time (Daylight or Standard as applicable). (Remember if you do not vote or abstain it is equivalent to a DISAPPROVE vote). Buzz, Thanks, wlq |