Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Bob, Nice job. However your attendance projections and the ones I have been keeping based on estimates from the WG chairs are slightly low. My estimate for FY '00 averages to approximately 455 attendees per meeting (versus your estimate of ~412), and for FY '01 around 390 attendees per meeting (versus your estimate of 375). See attached data--you may want to ammend your budget projections. If any WG chairs see a significant discrepency in the estimates I have recorded, please notify Bob, Buzz and I with the corrected estimates. Thanks, --Paul Nikolich At 12:27 PM 10/20/99 -0700, Grow, Bob wrote: >Attached for your preview, please find below a proposed LMSC budget for the >next two years, which I am required to submit to the Computer Society (I >have promised it following the November meeting). (Thanks to Buzz for his >contribution to the detailed CY 2000 budget.) I propose to submit the >following: > >CY 2000 >ESTIMATED INCOME >Meeting Fees 320,625 >Other Income 600 >Total 321,225 > >ESTIMATED EXPENSES >Meeting costs 209,450 >Document Distribution 1,500 >IPF to ANSI/IEEE 110,200 >Other Expenses 75 >Total 321,225 > >ESTIMATED TOTAL 0 > > >CY 2001 >ESTIMATED INCOME >Meeting Fees 320,625 >Other Income 450 >Total 321,075 > >ESTIMATED EXPENSES >Meeting costs 218,185 >Document Distribution 1,700 >IPF to ANSI/IEEE 101,800 >Other Expenses 90 >Total 321,075 > >ESTIMATED TOTAL 0 > > >The above proposed submission is based on the attached detailed budget. You >will note differences. The detailed budget is used to manage the operating >reserve and assure solvency. Notes to the budgets follow: > >1. The above budgets are based on the income projections found in the >detailed budgets. In operation, expenses are managed to income, and to a >large extent proportional to income (i.e., both based on meeting >attendance). > >2. The CY 2000 budget assumes current meeting fees. The CY 2001 budget >assumes a meeting fee increase of $25. The CY 2000 starting operating >reserve includes a projected 10.2k operating loss from our November 1999 >meeting. > >3. The detailed budgets are not in conformance with LMSC Operating Rules, >Procedure 2, item 6. This rule would require maintenance of an operating >reserve of approximately $80,000. This deviation from the rules is >recommended because of our relationship with our sponsor. The Computer >Society has adopted a policy (from which they will exempt us) of >confiscating any bank balance over $10,000. To maintain our independence, >it is felt best to keep the operating reserve below $40,000. > >4. The detailed projection of operating reserve is sufficient to cover a >planned shutdown of LMSC operations, but the projected reserve is >insufficient for worst case meeting cancellation expenses (a financial >exposure to our sponsor). > >5. The CY 2000 budget forecasts a larger than desired operating loss. >November meeting expenses are expected to be lower than budget, but Tampa is >a new meeting site so budget is intentionally high. The CY 2000 operating >loss is equal to the largely discretionary meeting equipment budget. Income >could also be improved by increasing fees earlier than CY 2001. > >6. The detailed budgets include IPF payments per current practice (~31% of >expenses). The anticipated change in ISO liaison status, as well as >different internationalization tracks for some of our Working Groups justify >a reallocation of this expense to other uses. This significantly changes >the budget. > >7. The detailed budgets do not include some proposed expense items. Though >equipment is budgeted, the costs for suggested meeting networking are >unknown and consequently may not be possible within the budget. The request >for addition of cookies to the afternoon refreshments has not been budgeted >(it would raise refreshments approximately $12.50 per attendee, requiring a >fee increase). > > <<00 Budget.pdf>> <<01 budget.pdf>> > >Attachment Converted: "c:\My Documents\Documents\Email_temp_storage\00 Budget.pdf" > >Attachment Converted: "c:\My Documents\Documents\Email_temp_storage\01 budget.pdf" >
rev11_99 attendance projections.PDF