IEEE 802.19 CLOSING REPORT
- July 2011
- San Francisco, CA The working group reviewed a
draft version of the 802.19 WG Operations Manual. Modifications
were made as a result of WG discussion and the WG voted to
approve the WG Operations Manual which is posted on the 802.19
web site. Task Group 1 completed the down selection process and
the winning contributions for the various clauses were provided
to the Technical Editor for preparation of a draft. After
completion of the first version of the draft the task group will
review the draft and provide comments, as per the agreed upon
process document.